|
|
|
|
| Projects / By Client / US Army Corps of Engineers |
|
|
|
|
Replace HVAC, Building 2300
|
|
Eglin AFB, FL
W91278-09-D-0023 Task Order 0002
US Army Corps of Engineers
|
|
|
|
|
|
|
|
|
The work consisted of the removal of the old system, then the installation of a new chiller, air handlers, pumps, boiler, piping, ductwork, controls, and the associated electrical for the equipment installation. The work included minor architectural support. |
|
|
|
| |