The required the filling and grading of the existing site to re-establish surface drainage to eliminate standing storm water runoff. The project focused on 5 separate areas where water currently ponds or erosion has ocurred.
The contractor erected temporary erosion control measures to prevent the transportation of silt from the site onto public roadways or waters. The site was graded to the lines and grades on the plans, seeded, fertilized, mulched, and turf established. Upon establishment of turf, the temporary erosion control measures were removed. The Contractor repaired two areas where erosion had occurred by the installation of two concrete flumes and the reinstallation of rip rap slope protection. |
|
|
|
| |