Rebuild Mobile Channel Ranges Product Details
Rebuild Mobile Channel Ranges
Mobile Bay, AL
HSCG82-06-C-3WCA60
US Coast Guard
$584,737
 
 
 
The scope of the project was to provide all all labor, equipment and materials to salvage five marine structures, demolish one wood aquatic structure and install five government furnished aquatic steel range structures and navigation materials in Mobile Bay, AL.
 
 

General view of working location and equipment

Setting the 1st 20' pile

The old structure and the new center pile

Vibratory hammer used to drive the center pile

Embedded center pile (in the water to the left of the picture) and the new five-pile jacket on the barge's deck

Placing the five-pile jacket on the new center pile

Rotating the five-pile jacket to the correct alignment

Completing the 60 fillet welds

Setting the tower onto the new file-pile structure

Surveying the four-pile structure

Setting the deck on the four-pile structure

Setting the tower on the deck of the four-pile structure

Demolition of an old structure

 